We have plenty of food, are not facing a laundry crisis, and don't yet feel like castaways, say Wilmore and Williams
world50 minutes ago
A total of 87 trains with a passenger capacity of 600 commuters each will operate across the emirate of Dubai at intervals of 225 seconds, reduced to 90 seconds during rush hours.
Dubai Roads and Transport Authority (RTA) announced the commencement of work on the mass transit project at a ceremony held at the Mina Al Salam yesterday. The event was attended by His Highness Shaikh Mohammed bin Rashid Al Maktoum, Vice-President and Prime Minister of the UAE and Ruler of Dubai and other senior government delegates.
Speaking at the event, Matter Al Tayer, Chairman of Board of Directors and Executive Director of Roads and Transport Authority, said: "The RTA is committed to further Dubai Government’s vision of providing the best infrastructure and services to the people, by ensuring that a world class road and public transport network is in place. RTA’s goal is to provide a safe and secure transport system for all."
Traffic volume is estimated at 27,000 passengers per hour for each line and in both directions once the Metro is functional. This volume will represent 12 per cent of the total expected trips in Dubai for 2020.
Advanced technology and safety features are a project mainstay. The trains will be completely electronic, which will aid in punctuality and logistical control, thereby accomplishing high traffic absorption rates. The stations themselves will boast state-of-the-art architecture and have been provided with amenities that ensure commuter security and comfort. Each station will have its own car park, taxi stand and bus stop for rapid change-over.
The first phase of the project is worth Dh15.5 billion and is expected to be completed by 2009. Phase Two will be functional by 2010. RTA is liaisoning with internationally renowned contractors for key project deliverables.
The Dubai Metro project is a key facet of the integrated transport system that the RTA is striving towards to better cater to the needs of a growing city. RTA is undertaking a number of feasibility and project expansion studies to further expand the Metro in the future and offer increased connectivity.
"The Dubai Metro project is only one part of a complete and integrated transportation solution that the Authority is aiming to develop to cater to Dubai's infrastructural requirements The complete solution will include new train and bus stations, renovations and additions to the roads network, water transport systems and advanced commuting systems all aimed at providing safe and advanced means of transport that will further Dubai's economic prosperity," Mattar Al Tayer concluded.
We have plenty of food, are not facing a laundry crisis, and don't yet feel like castaways, say Wilmore and Williams
world50 minutes ago
The 88-year-old pontiff emphasised the need for media literacy education to promote critical thinking
world1 hour ago
More than 46,000 killed, severe shortages in Gaza conflict
world2 hours ago
Unified platform for registration is only for residents and in the future systems may cater to tourists
aviation2 hours ago
Stewart says he has no plans to retire
entertainment2 hours ago
We cannot accept that children are freezing to death because hospitals have been destroyed or a country's energy network has been hit, says Francis in his yearly address to diplomats
world2 hours ago
Music streaming services together saw revenues from UK purchases rise almost 8 per cent to around two billion pounds
entertainment2 hours ago
Located near Dubai International Airport (DXB), it is the first of four sites that are being developed as part of the emirate's initial air taxi infrastructure network
aviation2 hours ago