Several listed subsidiaries of the Adani empire, which spans coal, airports, cement and media, collapsed in early trade, with some losing as much as 20%
business1 day ago
Etihad Rail, the developer and operator of the UAE National Rail Network, has announced the completion of 50 percent of the construction works of the marine rail bridge in the UAE, as part of Package B of Stage Two of the UAE National Rail Network. The marine rail bridge extends over one kilometre, connecting Khalifa Port with the UAE National Rail Network.
The bridge will play an important role in improving the transportation of goods in the region, reducing the costs of freight and trade. This will support Etihad Rail to establish a rail network for the UAE which connects major ports with manufacturing hubs and residential areas across the country, and contributes to reducing carbon emissions and preserving the environment through reducing truck trips.
Building the first marine bridge in the UAE National Railway Network required 18,300 m3 of reinforced concrete and 4,117 tonnes of steel. The bridge will be parallel to an existing road bridge, which spans the same length, and connects the Abu Dhabi mainland to the offshore container terminal area.
The construction of the marine bridge is being implemented in line with the highest environmental standards, where Etihad Rail is working on maintaining the water flow through ensuring that the extensions and the rubble of the new marine bridge align with the existing bridge, parallel to it. This guarantees the flow of water, which is an important factor for preserving the coral reefs surrounding the bridge.
ALSO READ:
The company continues construction works of the bridge according to extensive planning, where it has successfully overcome climatic and environmental challenges presented by the nature of the land’s topography. These challenges include tide changes, changes in wind speed and direction, as well as high temperatures and humidity.
Recently, Etihad Rail has announced completing construction works for Package A of Stage Two, which extends over 139 km, and its connection through Al Ghuwaifat on the border of Saudi Arabia with Stage One, which extends for 264 km from Habshan to Al Ruwais. This significant step brings the company closer to completing the UAE National Railway Network on schedule.
Several listed subsidiaries of the Adani empire, which spans coal, airports, cement and media, collapsed in early trade, with some losing as much as 20%
business1 day ago
Authorities said the Adani Group chairman and seven other defendants agreed to pay the bribes to Indian government officials to obtain contracts expected to yield $2 billion of profit over 20 years
business1 day ago
Company strengthening regional presence and service offering
business1 day ago
Sinochem may keep three refineries in China's Shandong province
business2 days ago
Memorandum of understanding aims to enhance cooperation in the construction sector
business2 days ago
Serenia Living’s architecture and interiors have been led by Palma’s expert team
business2 days ago
Company’s backward integration model reaps dividends
business2 days ago
Participating companies announce several cooperation achievements
business2 days ago