As part of the project, 16.5km of internal roads will be constructed in the area
infrastructure49 minutes ago
The Barakah Nuclear Energy Plant in Al Dhafrah Region of Abu Dhabi has successfully connected to the UAE's national electricity transmission grid. This marks the first time clean electricity produced at the plant is delivered to the nation.
The move was announced on Wednesday by the Emirates Nuclear Energy Corporation (ENEC) stating that its operations and maintenance subsidiary, Nawah Energy Company, in partnership with the Abu Dhabi Transmission and Despatch Company, TRANSCO - a subsidiary of Abu Dhabi National Energy Company, has connected Unit 1 of the Barakah Nuclear Energy Plant to the UAE grid.
As part of the project, 16.5km of internal roads will be constructed in the area
infrastructure49 minutes ago
Messi is the first Argentine to receive the honour and the first male soccer player
football59 minutes ago
The property markets in the four biggest emirates witnessed significant activity over the past year
realty1 hour ago
Runaway leaders Liverpool hold a five point advantage over second-placed Arsenal
football1 hour ago
Gaming influencers and content creators share their thoughts on the upcoming releases including 'Grand Theft Auto 6'
gaming1 hour ago
Gauff opened with a statement 6-4, 6-4 win over Swiatek in 1hr 51min of hard-hitting tennis to fire a warning shot ahead of the Australian Open
tennis1 hour ago
The airline issued a statement confirming the incident, emphasising that the safety and comfort of passengers and crew remain their top priority
aviation1 hour ago
Parents find school-specific winter wear unnecessary as children outgrow clothes quickly and the cold season is short-lived in the Emirates
education1 hour ago